22 November 2011
Doors and More - 22 November 2011
The side door was one of the items worked on today, but so was the interior framing, the main door and still some outside molding. I know the downstairs windows are placed in front of all of their openings, and I know that it was so cold today that the guys would love to have all the windows and all of the doors installed so that they could get some heat. Of course, the in-floor heating isn't hooked up yet, nor are the electric baseboards installed upstairs, so its still going to be a while before they can get warmed up. They'll just have to keep working hard so they stay as warm as possible.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment