Molding - 9 January 2012

First, I'd like to show you the bathroom vent (how exciting, eh?) that was installed last week. Thank goodness Brad had his camera with him when they were up on the roof installing this. I would certainly never have gotten up there to take this photo, so you are only seeing it because Brad was there.


Today, work continued on the main doors and on producing the moldings that will be used throughout the interior. You can see on the main doors that the interior panels are beginning to be filled in and all the detail pieces added. While Brad was working on these on the main floor of the Firehouse, Colin and Michael were working upstairs on cutting and sanding molding. Look closely at their photos. That isn't a gray picture, that is all the dust in the air from the saw and sander. Thank goodness for masks and eye protection.