A lot got done today that went a long way towards wrapping everything up. The stack around the boiler wires was constructed, completed, painted and installed. An adjustment to the front door was made and some beautiful new (well, old) handles were added. The upper window in the stairwell (18 feet up, up, up) had its epoxy spots sanded, then it was primed, and painted. Some dings in walls were also painted, as was an edge piece on the front doors and some spots on the front siding.
Also, many of the remaining working tools were removed - the leftover paint, brushes, ladders, staging, etc. All in all, a good day, well done. Many thanks to Brad and Joel on the carpentry and high painting side and Dennis for the rest of the painting.
No comments:
Post a Comment