29 May 2012

Post Construction Follow Up - 29 May 2012

Sash lifts are done and so are the sash locks. A whole lot of caulking got done today even though it had turned much cooler. At least the rain held off. The broken window was repaired and so were some divets in the wood floor.  Knobs were finished on all the storm window vents. The automatic door closer on the door to upstairs, the weatherstripping and the sweep on its bottom are all complete. The chain bolts in the main doors also got added today.




No comments:

Post a Comment