After the concrete footings dried and the frost wall forms were placed, the concrete was poured for the frost walls. The concrete boom was so long that the driver had to back it down the street, turn it around, open the boom and then come into the driveway so that he could avoid power lines. Good idea.
With this boom truck everyone seemed more safety conscious. So I dragged out my helmet, too. Some of the guys seemed a bit surprised to see their female general contractor had a helmet.
No comments:
Post a Comment