Rafters got re-enforced and some plywood was laid for the second story floor before the rain just got to heavy to continue. It rained the next day, too, but Pete Langille was able to come and make some changes to the drain pipe that the building inspector had requested. Finally, on the 28th all of the plywood flooring could go down and the preparations for the second story walls could be finalized.
No comments:
Post a Comment